Crews are continuing their work at night on Essex Street in downtown Boston, working to install two new water mains. Two crews are spearheading our operation on Essex Street between Chauncy Street and Kingston Street, working through the last couple hundred feet of pipe to be installed. An additional crew has been deployed to another section of Essex Street, between John F Fitzgerald Surface Road and South Street to install new 150’ section of water main.
top of page
bottom of page